Financial Models


 

Hello

Please wait while we finish the calculations.




Rail Simulation


Please provide the model information. Click each of the step headings and fill out the data forms. Click on Run Model once you have entered all the data. By selecting Run Model, you agree to our Terms and Conditions.


1. Model Info

You have no existing model data saved. Pick the model parameters and you can save the model after the results screen.

Train Sets Available in Database

Note that the acceleration is assumed to increase slowly and reaches the maximum level once the velocity reaches half of the maximum velocity.

Train Set Max Speed (kmph) Acceleration (m/s/s) Deceleration (m/s/s) Notes
Shinkansen 800 260 0.70 -0.40 Source: Wikipedia
Hitachi 395 Javelin 225 0.70 -0.79 Source: Wikipedia
Freight 80.00 0.50 -0.30 Totally made up data
TGV EuroDuplex 320 0.70 -0.40 Assumed acceleration and deceleration data
Bombardier Twindexx 200 0.70 -0.40 Assumed acceleration and deceleration data
Stadtler Kiss 160 1.10 -0.40 Assumed deceleration data
Alstom Coradia 160 0.70 -0.40 Assumed acceleration and deceleration data
Bombardier Omneo 160 0.70 -0.40 Assumed acceleration and deceleration data
ABB IC3 140 0.70 -0.40 Assumed acceleration and deceleration data
Alstom JT 42BW 200 0.70 -0.40 Assumed acceleration and deceleration data
Maglev - Transrapid 09 500 1.00 -1.00 Source: Wikipedia



Input parameters

To increase the number of stations and the maximum length of line, please upgrade to Premium plan.
Number of Stations incl. End Terminals Number of Slow Down Points
Number of Train Services Train Frequency seconds
Calculations Sensitivity m    
Checking Criteria      
Minimum Time Between Trains seconds Minimum Distance Between Trains m

 

Stations along the line

Provide the details of the stations including start and end stations.

Design speed is the maximum speed from the particular station to the next station or the next slow point. Even if the train can achieve a higher speed, the speed will be limited to the design speed in the calculations.

Station Station Name Distance from Start Stop Time Design Speed
Station 1 m sec kmph
Station 2 m sec kmph
Station 3 m sec kmph
Station 4 m sec kmph

Slow down points along the line (curves, vertical gradients, etc.)

Provide the details of slow down points such as start and end of curves, steep vertical gradients that will require reduction in speeds, etc.

Design speed is the maximum speed from the particular station to the next station or the next slow point. Even if the train can achieve a higher speed, the speed will be limited to the design speed in the calculations.

Slow Down Slow Down Point Name Location (Distance from Starting Terminal) Length of Slow Section Design Speed
Slow Down 1 m m kmph
Slow Down 2 m m kmph

Service Details


For each train service, provide a name, the train set used and the stations that the train stops at for that particular service. Use this to show skip-stop patterns or express services.

Use the adjustment factors for acceleration and deceleration to increase or reduce the default levels for the train-set.

Service Train Set Direction Speed Adjustment Acceleration Adjustment Deceleration Adjustment Stations Served

 
  By clicking RUN MODEL, you agree to our Terms and Conditions.

MyFinModel.com - another solution from Rock Creek Analytics.

© 2016-2024 MyFinModel.com